on 01-19-2009 11:55 AM
When I attach Material to an activity (item Category N Non-stock item) in Project Builder (CJ20N), It is peaking its Base unit of Measure as unit. Now when I try to change it, it is showing an error
Item category N: Only base unit of measure M allowed
Message no. CO344
But for the same material if I change the item Category to L Stock item, then it allows me to change the unit.
Please guide me regarding this Behavior. Is there any customization, by doing which it will allow me do the same for Non-stock Item or It is not Possible.
Hi,
for Non-stock item the Unit of Measure cannot be changed. Its SAP Standard
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
i have been able to attach a material to my activity using project builder and the unit of measure for a non stock item is changeable !!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
firstly I am assuming that the activity is internal processing type - doesn't matter really
now to attach a material select actvity and from the template area click and drag material which will open the material detail screen in the work area
because it is a non stock item I am assuming text description - in the requirements qty you enter the qty and next to it the units - changeable
if you choose a material number maintained as material master then obviously the unit will be from the material master.
If you are using an externally processing activity then in config check OPUU for the network type and see if order unit has been populated - that might be the problem
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.