on 01-14-2009 5:40 PM
Hi,
Currently we have 80 line items per Transfer Order. I want to configure it in such a way that it should have a maximum of 50 lines.
Can someone help me with this.
Thanks in advance,
Mike
The closest i know is to split the TO by weight and volume. If you are looking at 50 bins versus 80 bins, then you could have a picking area defined for 50 bins and in TO split config have the TO split by picking area. Unfornutely i am not aware of any splits for the number of TO items.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It can be done by configuring the performance data for TO split.
Define profile.
Control for Performance Data Processing / Define TO Split
Define TO item parameters.
I have defined unit of measure load category such that 1 line item of TO is equal to 1 second and then configured that after how many seconds the TO should split.