on 01-14-2009 7:21 AM
Dear Gurus,
My client test water once a day,for different parameters,sample of water is collected from five different points and each of which is tested.can i map the above scenario by 1) creating material master : Water
2) assign inspection type 89 in the Q.M view
3) creating inspection plan and Assign the required parameters as M.I.Cs in the inspection plan
3) manual creating inspection lot
Please let me know if i am on right track
Regards
Ram
Hello Ram
Yes, what you descibe is the correct procedure for setting up such a scenario.
Normally water is created as material type PIPE (pipeline material). If so, you will have to assign this materialtype to tasklist type Q in the configuration. The description of the points from where the water samples are taken, you should fill in in the "short text" field in Inspection Lot. There are a lot of nice functionality on this field, regarding searching, printouts etc.
Good luck
Regards
Jan Erik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Ram,
there is another way of water testing.
create water as non valuated material & assign 15 Inspection type in material master.
Create an inspection plan of usage 9 and inspection point 200
then create the physical samples of specific quantity from the specific location or functional location (created by PM).
Then Create the inspection lot (15 Origin) of this physical sample
now record the results & Ud & Take the Report of this
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ANSWER FOUND SATISFATORY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Ramkumar
My advice is
1. To create point wise equipment through IE01...
2. Maintaine general task list for all the water point thrugh IA05..
3. Create Maintenance plan for each point through IP42
3. Schedule all the plan as per frequency through IP10
AYK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ram
I have the same scenario at my place.
I activated 05 Inspection Type, maintained 3 Tasklists in Inspection Plan, At the start of shift the Power Users /Lab Techs creates a Manual Inspection Lot & manually select the Tasklist relevant. In my case we only have 3 types of tests so maintained only 3 tasklists,
If you like you can follow the same process by maintaining 5 tasklists.
Regards
AS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Happy New year, I think u rember me, Let us come to ur Point.
What are all the actvity you adpated is good and also the suggestion given also hold good.
Depending upon the scenario, u can create the material as valuvated or Non Valuvated If Water may be used in large number (Process Indsutry) In that case u need to be valvated or Pipline line Materials only, since you paying Water cess.
You discuss with MM AND PP Guy and decide how the Materil type would be and process the other things, You can incorporte the Inspection Points in the Inspection plan (Such as 150 as free Inspection ) and also insampling Plan. So that you can record the all 5 points details and can be brought to your report if needed using the SQVI)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hello Ram
1 ) Create a sampling procedure with Free inspection point selected in it
2) Create an inspection for the testing, add inspection point in the header
3) Ypu can maintain any freely defined inspection point(120 , 150 etc) . you can give an identification according to youe need. this can be done in customisation. SPRO> QM> Quality PLanning > Inspection planning > Define identifier for inspection point> Select the inspection point you would like to choose> go to Field> you can put the identification as per your need.
Note make sure that in Function module tab under Automatic creation of insp. points you maintian this FM QAPP_CUST_IP_CREATE ( Already maintian in 150 inspection point by SAP)
4) in inspection plan operation click on the QM contol key ( eg QM04) go to Quality Management view and maintain the relation ship ( it can be quantity wise or time wise otherwise maintain no relation)
5) when lot is created while result recording u will get a pop up for putting the inspection point identifier
Please let me know your feedback
Regrds
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Ram
You are right. If you do not have any trigger for inspection then 89 is the only option.
One more suggestion , Use inspection point so that you can input the result seperately for all the 5 different points with identification. This will help you in better analysis.
Let me know your feedback
Regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.