Hi Experts,

Please help.

I have created sales order. Then created Production order with reference to that sales order. Processed poduction order. Stock posted to QM stock. Done Result recording & UD. Stock posted to Unres.use stock. Now I want to quality inspect for delivery item of same sales order.and want to create quality certificate. What are setting require.

Please tell step by step.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member186399
Active Contributor
0 Kudos

Dear Raja,

Adding to Shyamal answer for Inspection for delivery you may have to do these steps also

1) SPRO > QM> Quality Inspection > Inspection lot creation > inspection at shipping > Assign inspection type to delivery type> assign inspection type 10 to the delivery type you need the inspection

2) Maintain customer info Record. QV51 which is a customer ,material combination. You can specify whether or not an inspection lot is created before or after the goods are shipped, or whether the quality inspection will be carried out by the customer.Also you can maintain default customer specifications for a customer or customer information records for customer/material combinations

3) Maintain 10 inspection type in MM02.

4) Create the inspection plan using the relevant Usage

Hope this helps

Regards

gajesh

rajesh_sutar2
Active Contributor
0 Kudos

Hi Gajesh,

Thanks for your response.

Edited by: Raja S on Jan 13, 2009 10:01 AM

Former Member
0 Kudos

Hello Raja,

You have mixed up two questions here.

1. To generate the Inspection lot for Delivery Item.

- Maintain Inspection type 10 in the material master.

- As soon as yoy perform Picking for the delivery it will geve you a lot.

2. To generate COA (quality Certificate)

- Create a COA Profile for first QC01.

- Where you need to assign the MICs from your inspection plan. Say... If you have 30 MICs in your inspection plan and need to print 15 only from them. then assign these 15 MIC in the sequence you wish to print them.

- Release the COA Profile.

- Assign the Material to the Profile (It have to be done separately through QC15 or QC16)

- Now run trx QC21 to print the COA. (It will be printed in STD SAP Lay out.

Regards,

Shyamal

rajesh_sutar2
Active Contributor
0 Kudos

Hi Shyamal,

Thanks for your response.

Edited by: Raja S on Jan 13, 2009 10:02 AM