add parameters in table BWOM_SETTINGS

Former Member
0 Kudos

Dear Friends,

Related to SAP R/3 ECC 6.0

I would like to add two parameter in table BWOM_SETTINGS for Minute based extraction

enhancement for FI related data extractors.

i check this scanario in my development system. and now i want to move these values

from development system to production system through quality.

But as per my knowledge we can not transport table values from Dev to Qas and Prd.

and we should manually enter the parameters in production system instead of transporting from Dev.

if my understanding is true then it can create inconsistancies between Prod and Dev server.

becuase incase somebody did change in PRD and forget the Dev.

any help higly appriciated.

Malik

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Malik,

As BWOM_SETTINGS is a table with Maintenance allowed you can manually create the Entries in Quality and then in Production.

Go to TxCode Se11.

Enter the table name.Select Display button.

Go to Utilities>Table Contents>Create Entries.

Specify the values of DataSource and Fieldname.

Then click on RESET button.

By this way you can make your values.

Let me know if you face any problem.

Thanks,

Sudheer.

Edited by: sudheer chowdhary on Jan 12, 2009 11:40 PM

Former Member
0 Kudos

thanks. sudheer i know how to maintain entries in the system.

my question is why should we open our production system for customization.

entries should come through transport.

and kalyan can you please tell me exact procedure how can i transport the table entries.

thanks with regards,

Malik

Former Member
0 Kudos

Hi Malik,

The values which you want to move to production are those standard values or came by some transactions.

Let me know.

Thanks,

Sudheer.

Former Member
0 Kudos

Dear Sudheer,

basically BWOM_SETTINGS table is a standard SAP table for SAP BW customization.

there are some standard values but i want to change some functionality of BW extractor behaviour.

For this we need to add two parameter in this table and i dont want to add these two values

directly in the production server. i want to change the values in development server and then

move these parameters values from dev to prod through the transport management system.

regards,

Malik

Former Member
0 Kudos

Hi,

Ok, when you in the table maintenance screen (through SE16) in the development system and you made all your changes.

1.Select the entries you would like transport.

2. From the menu "Table Entry" -> Transport Entries.

It prompts for a transport request and specify the transport# and you all set.

you can verify the transport thru se10 for contents.

Hope this helps,

Kalyan.

Former Member
0 Kudos

Thanks you.

regards

Malik

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

You should be able to transport the table entries, in this case BWOM_SETTINGS table --> from Table Browser (se16) you can move the all the entries to a transport request and move to the next system in the landscape.

Hope this helps.

Kalyan.