cancel
Showing results for 
Search instead for 
Did you mean: 

visul defect recording

Former Member
0 Kudos

Dear all

i wanna do visul defect decording and number of defects while in process and finish good inspection without result recording.plz tell me how i can do it.

thanks

Accepted Solutions (0)

Answers (10)

Answers (10)

Former Member
0 Kudos

closed

former_member186399
Active Contributor
0 Kudos

Dear Nirmala

If your lot status is CRTD you will not do the defect recording . You have to do the following settings

1) Go to MM02

2) QM View > Inspection setup

3) Untick following options for the inspection type

Insp with Material Spec

Insp with Task List

Insp by Configuration

Automatic Assignment

Check Chars

Keep the other setting as same

Now Create a new Lot and do the defect recording

Hope this solves

Regards

gajesh

Former Member
0 Kudos

yes gajesh

former_member186399
Active Contributor
0 Kudos

Dear Nirmala,

What is the status of the lot. Is it CRTD?

Regards

gajesh

Former Member
0 Kudos

Hi gajesh

i m not attaching any inspection plan.

Regards

Nirmala

former_member186399
Active Contributor
0 Kudos

hello,

Are you attaching any inspection plan to the material. Please give me the details on the error you are getting. System diagnosis

Regards

gajesh

Former Member
0 Kudos

Dear gajesh

Thanks

i have done same like u told me with report type 10 ie defect type and number of defects. but system is desplying msg" Status ckeck error"

i m in textile industry here i wanna do visual defect recording like node... and number of it in diferent operation like warping,sizing.and there is no any RR.

Nirmala

Edited by: Nirmala Vitekar on Jan 13, 2009 10:13 AM

Edited by: Nirmala Vitekar on Jan 13, 2009 10:14 AM

former_member186399
Active Contributor
0 Kudos

Dear Nirmala,

If you want to do defect recording without result recording it is possible in the standard itself

Go to QA32, select the lot and click on defects otherwise defect recording tab is there in the Usage decision screen also.

Please explain your issue if i have understood you wrong

Regards

gajesh

Former Member
0 Kudos

Dear sir,

Thanks for u r quick reply.

Regards

Nirmala

Edited by: Nirmala Vitekar on Jan 13, 2009 6:10 AM

Former Member
0 Kudos

Dear Nirmala,

What do you mean by defect decording ?? is it defect recording ??.Usually we do defect recording / and number of defects while doing result recording itself against inspection lot created.

But if you want to do defect recording w/o result recording then I think you can do it by generation manual notification for that if required you can refer inspection lot or direct for specific material. Here you can put the type of defect and accordingly can have CAPA.

BR

Shekhar