Dear All,

During Availability Check in Sales Order we do not get 'Other Plant' option in availability control window.

We are using Requirement Type KMPN (AssemOrd. with network/project) & Requirement Class (212 Netplan/proj.settlmt), Planning Statergy 85 Assembly processing with network/project, Availability Check 02 & Checking Rule AE.

Please guide.

Regards,

Mahendra

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You can select a plant with sufficient quantity for confirmation to be copied automatically

into the Overview screen. Select the appropriate line and select Edit Copy plant.

Using the user exit USEREXIT_PLANT_SELECTION in the Include LV03VFZZ you

can make a preselection of the allowed plants. If you use this option, the Plant

selection dialog box does not appear and the availability check is performed

immediately for the allowed plants. If, on the basis of information resulting from the

availability check, you want to deliver from a plant other than the one specified in the

item, you must at present enter this plant manually in the item. In a later release,

however, you will be able to select the plant directly from the list of plants.

Viswanath

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi

Proabably, the other plant which you want to check is not assiged to the sales organization for which you are creating the order. The System displays other plants push button only if multiple plants are assigned to one sales organization and Distribution channel. Please fix that assignment and then check the other plant push button.

Regards

Srinivas

Former Member
0 Kudos

Hi,

Have you checked in delivering plant at the item level.

Whether at that it is showing other plant or not???

Go to VA02 and select your line item and check in the shipping tab.

In that whether you are able to assign your other plant in that or not.

If not then what error system gives can you tell us that.

Regards

Raj.

Former Member
0 Kudos

If check required at Multiple Plant, I suppose this functionality is available in APO - GATP (Global ATP).

Regards,

Rajesh Banka