on 01-09-2009 5:38 AM
hi all
We maintained minimum order quantity for material ; can we put massage sale oraganization wise
ie for SO IN01 Massage type is 'E"
& for IN02 massage type is 'W"
If my minimum order qty. is 10 then SAP will accept the sale order qty. with multiple of 10 .
Eg. If customer placed order qty. 15 Nos. Dose SAP convert it into 20 automatically ?
PL. suggest me how to configure this scnerio
Hello,
Min sales order qty is controlled through MMR Sales Org 1 - if you want it to round up or down to the correct order quantity then you will need to create a rounding profile (see below).
Otherwise to change your message from a info or warning to an error goto transaction OVAH message V4 082 and change to E = error.
Rounding Profile
Key that the system uses to adjust the order proposal quantity to deliverable units.
Procedure
In Customizing, enter a threshold value from which the system should round up to the next value per deliverable unit:
If the requirements value exceeds the first threshold value, the system always rounds up to the next multiple of the level found
If the requirements value falls below the first threshold value, the system copies the original requirements value.
Two other types of rounding exist:
Dynamic rounding profile:
These profiles are used to round up quantities to logistical units of measure (for example, layers). The contents of a logistical unit of measure does not have to be know when creating the rounding profile. It is determined by the master data from the material master.
Rounding profile with quantity to be added/subtracted
With these profiles, the given quantity is changed either by adding a percentage or subtracting a percentage.
Only static rounding profiles are taken into account in requirements planning. Neither dynamic rounding profiles not quantity addition/ subtraction are taken into account.
Examples
A material's base unit of measure is 1 unit; the purchase order is to be delivered in layers (1 layer corresponds to 5 units) or in pallets (1 pallet corresponds to 8 layers which contains 40 units).
You maintain the profile as follows:
From a requirements of 2 units, the system is to round up to 5; from a requirement of 32 units, the system is to round up to 40.
This results in the following order proposal quantities:
Requirement from 1 -> 1 requirement from 31 -> 30
Requirement from 2 -> 5 requirement from 32 -> 40
Requirement from 6 -> 10 requirement from 74 -> 80
Requirement from 7 -> 10
Dependencies
If no rounding profile has been entered, the system uses the rounding value entered in the material master record for the planning run
Kind regards
Sue
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In MM02 you can maintain minimum order quantity for that particular product.
In sales: sales org. 1 tab you will find min order quantity field.
Hope so this will help you out.
Regards
Raj.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.