on 12-27-2008 6:35 AM
hi,
In QA32 status of inspection lot is CRTD CHCR SPRQ CTCM (inspection type 01)
here Inspection plan was not ready for that material.
so I created one inspection plan and tried to assign it in the change mode of that inspection lot
but it is not getting assigned; I don't understand what may be the reason for non assignment?
because before this I have done such assignments lot of times.
please help
Thanks
vinay
Hi Vinay,
Check below listed matters.
- Valid from date for inspection plan must be later then then Inspection lot date. i.e. Check the inspection lot date, it must be prior then inspection plan's valid from date.
- The Lot size range you have entered to the Inspection plan must cover the Inspection lot size.
- Material must be assigned to the inspection plan, with proper valid from date.
I think you must have stuck in the Valid from date of inspection plan. To cross check the same. Check it this way.
- QP03--> enter the required details like Materials/Plant or Group / Plant.
- In the header screen, check what date is there for 'Valid from Date'. This date must be later then inspection lot creation date.
- If it's not, then go to QA02. Enter your lot number. and change the 'Key Date' for the inspection lot according to the inspection plan valid from date.
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.