Dear all
Please tell me the step by step process ( of LSMW ) to upload the Inspection Plan in the QM module. If possible with screen shots. Thanks in advance.
Selva
Hi,
You can use following steps for LSMW -
1) Maintain Object Attributes - Use standard object 0240 (Inspection Plans (QM)) / Method 0000 (Batch Input) / Programme name RCPTRA01.
2) Maintain Source Structure - Maintain three level structure:
Header Data
\--> Operation Data
\--> Characteristics Data
3) Maintain Source Fields - Maintain as per following -
Header Data
MATNR C(018) Material Number
WERKS C(004) Plant
PLNNR C(008) Group
PLNAL C(002) Group Counter of Assigned Task List
DATUV C(010) Valid From
VERWE C(003) Usage
STATU C(003) Status
LOSVN C(017) Lot Size from
LOSBS C(017) Lot Size to
KTEXT C(040) Task List Description
PLNME C(003) Unit of Measure
QDYNHEAD C(001) Level of Dynamic Modification Rule
QDYNREGEL C(003) Dynamic Modification Rule
LIFNR C(010) Vendor Number
Operation data
MATNR C(018) Material
VORNR C(004) Operation Number
STEUS C(004) Control Key
ARBPL C(008) Work Center
WERKS C(004) Plant
LTXA1 C(040) Short Text
MEINH C(003) Operation Unit
BMSCH C(017) Base Quantity
PLNNR C(008) Group
PLNAL C(002) Group Counter
Characterisctics Data
VORNR C(004) Operation Number
MERKNR C(004) Inspection Characteristics Number
VERWMERKM C(008) Master Inspection Characteristics Number
KURZTEXT C(040) Short Text
QUANTITAT C(001) Indicator: Quantitative Characteristics
STICHPRVER C(008) Sampling Procedure
QPMK_REF C(001) Reference to MIC in Task List
QPMK_ZAEHL C(004) Plant for MIC
SPCKRIT C(003) SPC Criteria
MKVERSION C(006) Version Number of MIC
PLNNR C(008) Group
PLNAL C(002) Group Counter
PMETHODE C(008) Inspection Method
PMTVERSION C(002) Version of Inspection Method
QMTB_WERKS C(004) Plant for Inspection Method
4) Maintain Structure Relationships -
BI000 - Header Data
BI001 - Header Data
BIMPL - Header Data
BIPKO - Header Data
BIPPO - Operation data
BIPMK - Characteristics Data
5) Maintain three source files (each for Header Data, Operation data, characteristics Data) as per fields maintained in the source fields. Maintain the QM Master data first before next steps. Also maintain the characteristics in CAPITAL letters.
6) Specify the files to the LSMW
7) Assign these files to the three structures (Header data file to header structure, operation data file to operation structure, charcteristics data file to characteristics structure).
😎 Follow next steps of the LSMW.
The inspection plan will be uploaded in the system
I do not know how to post the screen shots in the SDN.
Hope this answer helps. If you have any queries, pl revert.
Regards,
Prashant
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Prashant
Thanks a lot for your detailed answer. I shall try the same and revert back to you in case of any clarifications.
regards
Selvakumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
11 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.