Difference between version SAP R/3 4.6C and SAP ERP 6.0

Former Member
0 Kudos

Hi,

Could anyone please provide me the link or document which describes major differences between versions SAP R/3 4.6C and SAP ERP 6.0 for PS Module?

Accepted Solutions (1)

Accepted Solutions (1)

nitin_patoliya
Active Contributor
0 Kudos

As per functtionality is concern, there is least change in both the version you can get idea of the the same from the SAP Release note. However in one of the assignment we have made SMTD document core part of it I am sharing with you.

-


Tcode CJ20n/CJ01/CJ11/CJ27 (Create/Change/Display)

New Features

u2022cProjects

u2022Integrated Product Process Engineering Tab

Requisite Configuration Settings for iPPE

Path :

SPRO> Project System>Structures>Operative Structures>Work Breakdown Structure -->Create Project Profile

SPRO >Project System>Structures>Operative Structures>Networks>Settings for Networks>

Maintain Network Profile

SPRO--> Project System >Material> Integration of Project system with iPPE-->Define Reference points for the Integration of the Project system with iPPE

Usage:

cProjects

u2022Work Overview & Selection list

u2022Self Services for creating and editing project objects

u2022Communication via email

u2022Assigning Resources to Project objects

u2022Confirmations & Reports

Integrated Product Process Engineering

Transfer of Product Structure from Integrated Product Process Engineering to Project systems via iPPE nodes to Project definitions, WBS Elements, Network activities by means of a reference point.

-


Tcode: CNR2/CR02 ( Work Center Change)

New Features

u2022In Basic Data tab, Standard Value Maintenance screen, Screen Variants can be maintained

u2022In Default Value tab, Screen variants can be maintained for Unit of Measure of Standard Values

New Features

Capacity Header can be viewed in ECC 6.0

-


T Code: CN24N (Overall Network Scheduling)

New Features

u2022 New transaction in ECC 6.0

u2022 Multiple Network Scheduling

Advantages:

1.The main advantage of the overall network scheduling asynchronously is the restriction over networks, to be schedule is possible while working with large sub network projects which reduces time.

2.Option of giving level is a new feature which can be used as Selection criterion. Maximum of 9 levels for standard networks can be used.

3.Option of scheduling networks or only sub networks is possible.

Prerequisites of Network Scheduling:

Scheduling parameters to be maintained

Levels of Network to be maintained

Path: SPRO -->Dates > Scheduling> Define Levels of Network

-


TCode: IMCBR3 (Mass Release of Budget)

New Features

u2022 New transaction in ECC 6.0

u2022 Budget can be released for one fiscal year

Advantages :

1. Releasing of budget is possible on percentage basis.

2. Possibility of releasing the budget for one fiscal year.

-


T Code: CJR2 (Planning Cost Elements/Activity Inputs)

In ECC 6.0 CJR2 has been enhanced when compared to CJR2 in 4.7. Negative values can be planned by using CJR2 transaction for Investment revenues (Eg: Selling out own fixed assets)

Advantages

The planning of the investment revenue (generated from sale of asset) can be planned as negative revenue with a minus sign in ECC 6.0 where as its not possible to maintain any sort of negative values in revenue prior to this version.

-


T code : COGI (Automatic Goods Movement Error Handling)

New Feature :

u2022List display

Usage:

u2022In ECC 6.0, selection can be made between List & Grid display

-


T code : COFC (Reprocessing of confirmations)

New Feature :

u2022Output Criterion (Maximum selected lines)

Usage:

u2022 In ECC 6.0, selection can be made between List & display mode

u2022 Order category can be set as an input parameter

-


T Code CNPAWB (Progress Analysis Workbench)

In ECC6.0, this is totally a new transaction code

Advantages:

1. The main advantage of this transaction is to update the status of the object

2. Updating confirmation details

3. Multiple projects can be compared from a single view

-


T Code: CN41n (Project Structure Overview)

In ECC6.0, the transaction for Structural overview (CN41) is enhanced to CN41n which is user friendly.

Advantages:

1. The main advantage of CN41n over CN41 is editing is possible in detailed navigations of the master data

2. Standard Variants can be created

-


Regards

Nitin

Former Member
0 Kudos

Hello Nitin,

Where did you find these t-code wise upgradation changes? What is SMTD?

Former Member
0 Kudos

The best way to find all the changes among the various versions is to refer to the various detailed release notes in the system itself.

Go to T code SO99 (Release notes), and click on the "mySAPRelease notes: entire list". As per your requirement ie version upgrade, you can select the relevant release notes and go into the display structure.

Under the PS node you can see the detailed documentation of the changes from one version to the other. I found this very useful.

Venu

nitin_patoliya
Active Contributor
0 Kudos

I was away from Office so, bit late to reply .

Coming to your point, SMTD ( System Migration Technical Document ) which we made for as part of upgrade / migration. You can say this is not standard term but in SAP consultncy sapce it is being used largely.

Hoever, i am agree with Venu, Release note is the best option to compare the diff. between the two version / what are the funcationality has been added in pertucular version.

Regards

Nitin

Former Member
0 Kudos

Hi Nitin,

'define reference points for integration of PS wih iPPE' is the SPRO setting. I would really appreciate if you can help me understand, how is it used in Application. Where do we use this connection in easy access or in application?

Thanks

A

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks Nitin and Chandra. I have awarded you the points.

Former Member
0 Kudos

Hi....

Im adding to Nitin....thread.

Please refer

You can find the difference in release notes of each SAP version.

Here are the links.

http://help.sap.com/saphelp_47x200/helpdata/en/fc/e3003deddfae4de10000000a114084/frameset.htm

http://help.sap.com/saphelp_scm50/helpdata/en/28/b34c40cc538437e10000000a155106/frameset.htm

http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm

https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/sapERP6.0+Upgrade

https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/transactionsChangedinECC6.0

Please check the below link for the differences between the two releases..

http://solutionbrowser.erp.sap.fmpmedia.com/Default.aspx

Select the source and target versions of release and the solution area and the module...you will get the list of all the differences.

I hope it will reach your req.

Regards

Chandra