Hello All,

I am trying to configure maintenance optimizer in Solution Manager 7.0

on Windows 2003 server and SQL 2005 server.

I am configuring this for SAP CRM 2007 server.

Created the server, database and system in SMSY

Created Logical Component in TA code SMSY

SM59 connection for SAP-OSS is OK.

S-User is assigned to a User.

Created a solution using TA code solution_manager.

Defined the product version for the solution created in the TA code

solution_manager.

When creating a Maintenance Optimizer transaction, I select the

product version and its logical component in the Plan Maintenance

(Phase) and click on Continue to go to Select Files Phase, I get below

warning:

Information Procedure 8000000130 Saved

Warning: Status was reset by system

Warning: There is already a transaction for the systems of this

product version

I cannot get pass this phase.

I have deleted and recreated the solution, carried out the same

activity again but its giving the same Warning

Warning: Status was reset by system

Warning: There is already a transaction for the systems of this

product version

Any help will be appreciated???

Regards,

Satish.

Accepted Solutions (0)

Answers (4)

Answers (4)

sureshs_nadar
Explorer
0 Kudos

Hi Friend

Thanks a lot .

Your message has helped me a lot.Now the issue is resolved.

Regards,

Laxman.

Former Member
0 Kudos

Hi,

You (or someone with authorization) have already started the procedure in some other solution, and the SAP is not allowing 2 simultaneous procedures.

Enter Tx

/n/tmwflow/maintenance

and select (double click) the already stated transaction. Continue or cancel it.

Long-term solution:

In tx SPRO use CTRL+F to search IMG Activity "Assign Conditions to Status Values"

Execute.

Find the entry "SLMO SLMO0001 E0002 40 SYSTEM_ASSIGNMENT", change its message type (column "MT") from "Cancel" to "Warning"; then save it.

For more info see Note 1296589

Regards,

Nenad

Former Member
0 Kudos

Thx for the response I will try and let u know.....

Former Member
0 Kudos

Hi Nenad,

We had the same issue.

The issue is resolved after I just followed your steps(as mentioned in SAP Note 1296859).

Thanks Nenad. You Rock..

Regards,

Sanjai

raguraman_c
Active Contributor
0 Kudos

Hi,

Do you have ChaRM in place? Also let me know if you are having multiple customer number.

Feel free to revert back.

--Ragu

Edited by: Raguraman C on Dec 31, 2008 10:10 AM

Former Member
0 Kudos

Hello Ragu,

Thanks for your response.

As of now, we do not have ChaRM in place. Secondly, we use a single customer number.

I would like to let you know that in our landscape we have two CRM server, one ECC sever, one SOLMAN7.0 server.

I tried to configure MOPZ for CRM, ECC, SOLMAN server to download the respective STACKS.

I was successful in configuring CRM and SOLMAN.

But when I tried to configure in ECC, it failed due to RFC erros.

So I deleted the transaction for the ECC system and deleted the system itself in Solution Manager.

Reconfigured the Systems in "SMSY", RFC connections are correctly defined to configure MOPZ between SOLMAN7.0 and ECC6.0.

When I start configuring the MOPZ, I cannot get pass the first phase and this is when I get an error: There is already a transaction for the systems of this product version.

Please let me know if you need further information.

Regards,

Satish.

raguraman_c
Active Contributor
0 Kudos

Hi,

Try running a self diagnosis.

Open the solution. Menu Settings --> Self Diagnosis

or click on the button Self Diagnosis (Next to refresh button).

Feel free to revert back.

--Ragu

Former Member
0 Kudos

still waiting for the reply.....anyone plz enlighten....