cancel
Showing results for 
Search instead for 
Did you mean: 

DOL materials

Former Member
0 Kudos

Dear All,

I am a QM Consultant.

What are the conditions to be maintained for DOL matrerials in QM View, Quality Info recod, Dynamic modification rule, Sampling procedure & scheme, Quality plan etc.??

Regs,

RPV

Accepted Solutions (1)

Accepted Solutions (1)

former_member608385
Active Participant
0 Kudos

DEAR Velu,

Please go thru the following link :

Regards.

[http://help.sap.com/saphelp_47x200/helpdata/en/2d/351dd0448c11d189420000e829fbbd/frameset.htm]

Answers (4)

Answers (4)

former_member186399
Active Contributor
0 Kudos

hello velu,

go to qp01, and in the header of the inspection plan you can change the DMR level at Parameters for inspection points and Dynamic modification

Regards

gajesh

Former Member
0 Kudos

Hi,

But, it is not changed in Quality level for the respective material - TCode: QDL3.

It displays at Charac. level only. How to update??

Reg,

RPV.

Edited by: Velu on Dec 18, 2008 3:21 PM

Former Member
0 Kudos

Hi,

how to change dynamic modification rule from Charac level to Lot level???

Reg

RPV.

Former Member
0 Kudos

What is DOL Material ?

Former Member
0 Kudos

can you elobararte the requirement ?

Former Member
0 Kudos

Dear Yasodha,

Actually i need to implement DOL Inspection process for certain items to our group company. For that i need clarification for the following

1. Diff between Skip lot & DOL lot

2. How to identify DOL lots / items? Is it from Material master or Quality info record?

3. Link between DOL to Sampling procedure & Sampling scheme

4. Dynamic modification rule is required for DOL items / lots

5. Why DOL is required?

6. What is the status profile for DOL?

7. Link between QM View & DOL, Are we require to maintain specific data in QM View?

I hope you can understand that i am in a very basic level in DOL. Kindly brief the same.

thanks

RPV.