cancel
Showing results for 
Search instead for 
Did you mean: 

Vendor wise retest period

former_member1244710
Participant
0 Kudos

Dear All ,

My client has a scenario in which the same material is supplied by multiple vendors . The retest period (inspection interval in material master) for materials supplied by different vendors is different .

The requirement is that the next inspection date in batch master should be calculated based on the vendor who has supplied the particular batch and the retest period for the material supplied by the particular vendor .

Can I have guidance about the master and /or config settings to achieve this ?

Ram ~

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello, Ram,

It's not possible with STD SAP.

So you will have to modify the STD program Or you can create Vendor wise material codes.

Regards,

Shyamal

Answers (1)

Answers (1)

former_member186399
Active Contributor
0 Kudos

Dear Ram

As said by Shyamal there is no standard sap solution for this. But with development you can alter the next inspection date. Use this user exit with correct logic

QEVA0003 Calculate "Next inspection date" for batch

Revert back with your feedback

regards

gajesh

former_member1244710
Participant
0 Kudos

Thanks alot Shyamal and Gajesh I will look into it and come back .