on 12-13-2008 6:21 AM
Dear Gurs,
Pls help me for the scenario as mentioned followed.
I have a one material. for that there is a 3 differenet vendors. for that material Length is a one MIC.but as per vendor limit is different. I don't want to use a 3 different MIC for vendor wise. Requirment is One Material, One MIC but Limit should be come in Inspection plan as per vendor.
MIC u2013 length
Vendors u2013 A,B and C
Vendor Spec for length for the SAME material u2013 10-12cm,10-18cm,10-20cm (A,B and C vendors)
For GR if vendor is B then for that Inspcection lot limit of the MIC legnth should be reflected as a 10-18 cm.
Thanks in advance for help.
Hi Mihir,
There are two ways to incorporate the requirement.
1. Create that much number of task list counters for the inspection plans, same as the Vendors you have. I means One Task list group counter 01 will be assigned to Material 'M' Vendor 'A', counter 02 for Material 'M' Vendor 'B', & counter 03 for Material 'M' Vendor 'C'.
2. Refer the [wiki document|https://wiki.sdn.sap.com/wiki/display/PLM/SameParameters-DifferentSpecifications]
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.