Dear All

As per my business process i need expiry and retest date one day before from the Mfg date.

Fo that i have maintained the data in remaining shelf life /Maximum shelf life/Total shelf life and inspection interval in MM.

I.e If mfg date : 12.12.2008 and based on stability i need recurring inspection after 1 year and want to keep expiry as 3 year.

data maintained in MM as

MM Date appear in MSC2N

Inspection interval : 364 days 11.12.2009

Remaining shelf life : 1094 12.12.2011

Maximum and total shelf life : 1095.

My requirement is, expiry date shall update as 11.12.2011 insead of 12.12.2008

AYK

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Maintain Min. Rem. Shelf Life : 1, Total shelf life : 1094, Period Ind. for SLED : D in Plant data/stor.1 and Inspection interval :365 in Quality Management views of Material master.

Now create batch, enter manufacturing date and check for expiry date.

Check it and revert back for further clarifications

regards

Venkat.V