We experienced problems in transferring the Catalog item to the shopping cart. The following error message appears:

"Incomplete items in catalog. Only complete items were transferred "

I checked SLG1 for the OCI error message and found this log:

"Unit of measure PCE is not an ISO code. Item will not be transferred"

I checked table CUNI in both the ERP and SRM server and I found out that PCE is indeed an ISO code. How can I resolve this error? The system is saying that PCE is not an ISO code but the table shows that it is. Is this a bug or something?

Would appreciate your help. Thanks in advance!

ADP

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

It turned out that in ERP and SRM, ST is the ISO code used for UOM piece. The ISO code in the Data Manager was changed to synchronize the three systems.