on 12-10-2008 10:17 AM
Hi Everyone,
Is there a way for me to have a snyc connection given that my mapping is a two step? Because when I try to activate my interface mapping, it doesnt allow me because I have a sync message interface in it.
Thanks
You can have 2 mappings in sequence in interface mapping but 1:n or n:1 mapping can not be specified for sync interfaces.
Thanks,
Beena.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Beena,
Thanks for the answer
To give a background of what Im doing, the first mapping converts an IDOC to an XML. After that, an XSL mapping will transform it to XML string. What I want to do after that is have a sync connection with our trading partner to get a response back from them. But IR says it is not possible to have sync interface in my interface mapping.
With that, is it still doable?
Thanks
User | Count |
---|---|
89 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.