Single inspection lot for multiple operation

Former Member
0 Kudos

Hi

I am creating a process order having 10 operation. the 3,5 and 8 are quality inspection (inprocess inspection) & last is PP operation that is for final confirmation.

The control key in quality operations are pi02 and for production operation are pi03.

i am using insp type 03 in material master

Curently only one inspection lot is trigerring for all operations hence while RR, all operation are appearing (Quality & production).

User needs diffirent inspection lots for different quality operation.

How can i triggere lots per QC operation??

I would be vary thankful if i get it.

AYK

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Std will create one inspection lot for 1 process order

and RR will show all operations which is related to inspection

ask PP guy that cotrol indicator Pi03 - insp. char to be uncheck

then it will not show those operations not relevant for inspection

is't fullfill your requirement

why your business needs individual inspection lot for each operation?

give info

Thanks

Sami

Former Member
0 Kudos

Thanks for reply sami

can u please help me how to assign UNCHECK to insp. charac for PI03 ?

Former Member
0 Kudos

AYK

goto control key for operations in SPRO

select PI03 and uncheck the inspection characteristic

thanks

sami

Former Member
0 Kudos

Thanks sami... will update the status if it is done

AYK

Former Member
0 Kudos

Dear Sami

AS per the guidence given by u i have assign Uncheck insp. charact for PI01 and PI04.

Still while result recording those operations are appearing.

AYK

Former Member
0 Kudos

Hi

please go through your issue

you said initially PI02 and PI03

but now you are saying you unchecked PI01 and PI04

anyway whatever not relevent for MIC assignment you can uncheck insp. char

after that you have to create new process order,then system will not show up

thanks

Sami

Former Member
0 Kudos

Sorry for it was my mistake i have tried with PI01 and PI04,

after assigning Uncheck for both the key, process order created. Still both operation are appearing during result recording.

AYK

Answers (2)

Answers (2)

Former Member
0 Kudos

hai AYK

You ca assign inspection point to the task list.

so that you can record result against operation.

thanks

bhuvaneswaran

Former Member
0 Kudos

HI

generally you gat a inspection lot for order not for each operation.

-ashok