Hi
I am creating a process order having 10 operation. the 3,5 and 8 are quality inspection (inprocess inspection) & last is PP operation that is for final confirmation.
The control key in quality operations are pi02 and for production operation are pi03.
i am using insp type 03 in material master
Curently only one inspection lot is trigerring for all operations hence while RR, all operation are appearing (Quality & production).
User needs diffirent inspection lots for different quality operation.
How can i triggere lots per QC operation??
I would be vary thankful if i get it.
AYK
Hi
Std will create one inspection lot for 1 process order
and RR will show all operations which is related to inspection
ask PP guy that cotrol indicator Pi03 - insp. char to be uncheck
then it will not show those operations not relevant for inspection
is't fullfill your requirement
why your business needs individual inspection lot for each operation?
give info
Thanks
Sami
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hai AYK
You ca assign inspection point to the task list.
so that you can record result against operation.
thanks
bhuvaneswaran
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
generally you gat a inspection lot for order not for each operation.
-ashok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.