on 12-06-2008 10:39 AM
Hi All,
Can you give me some solution for my scenario.
1) I have imported two tracks Track1 and Track2 from the server and created project locally from Inactive DCs.
2) I have already existing DC1 from SC1->Track1 and also i have another track Track2-->SC2. In SC2 i have created new dc DC2.DC2 is still in both Inactive DCs only.
3) I need to use DC1 as used dc in DC2.
4) when i tried to do Used Dc from DC2, i cannot able to see Track1 SCs and DCs, only Track 2 is visible.
Can you please provide some steps or documents for me to proceed further, it will be very helpful for me.
Can you tell how can add Public Part and Used DC.
Thanks & Regards,
Suresh T
Suresh,
I think you should do the following:
Define build time dependency of SC2 from SC1 in SLD.
Update CMS to bring SLD change.
Add SC1 to Requirement components in SC2 track.
Save-Restore SC2.
Check-in and import SC1 into CMS.
In NWDS sync projects from DTR.
DCs from SC1 should be available for SC2 to reference.
Regargs,
Slava
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
To get this working you'll need to do the following after following Slava's steps: Set up a transport connection (in CMS Landscape Configurator) from Track 1 to Track 2, so that SC1 becomes available in Track 2. You can import SC1 into Track 2 after it has been Approved in Track 1.
Note that the following step that Slava mentioned should not be done manually: "Add SC1 to Requirement components in SC2 track." After the Update CMS procedure, you should click the Synchronize SC Dependencies button in Track 2. This should automatically add SC1 to the Required Components table.