Pre requisite before running MD51--project driven planning

Former Member
0 Kudos

Dear Experts,

I am executing MD51, but no planned orders are generated.

can u pls. suggest whr i m missing the steps .

What i did:

1-created WBS BOM taking reference to the material BOM.

2-Attached that wbs bom in the activity

3-Entered the desired work center and activity in the internal activity

then i am trying to run MD51.

Whether above steps are correct or do i need to create routing and to attach with the material.

Pls. suggest how the routing part will be taken care in this scenario.

is there any other method through which we can generate planned order from the reservation which is created in the network.

Regards

ashis

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Mohanty,

Try this , may help you :

http://help.sap.com/erp2005_ehp_04/helpdata/EN/8a/a590f54adc11d189740000e8322d00/frameset.htm

Thanks,

Dhruv Kumar Malhotra

Former Member
0 Kudos

hi dhruv,

its helpful and points awarded, but i need some a specific answer for this.

regards

ashis

Former Member
0 Kudos

Hi Ashis

You can generate planned order from the reservation which is created in the network thru MD01 and MD02.

check you mrp parameters in Material Master

in MRP 1,2,3 Tabs

check. the Planned independent requirements is'02'

in material master

also you should check the material wch generates Planned order is Procurement type E in the Material master.

Thanks,

Dhruv Kumar Malhotra

Edited by: Dhruv Kumar Malhotra on Dec 5, 2008 7:57 AM