on 12-04-2008 11:57 AM
Dear all,
I would like to know if it is possible to split a Sales Order line into multiple DN line automatically when we create DN? Either by IMG configuration or by user exit?
SO: Material A 10 pc.
In the plant, there are 3 in storage location A, and 7 in storage location B.
When I create DN with VL01N
It automatically propose 2 line:
Storage Location A: 3
Storage Location B: 7
Is it possible?? Many Many Thanks!
Best regards,
Chris
Please check Note 38262.
Note 415716 explains the information of user exits in delivery processing. I hope they might do any help.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Naresh,
Thanks for your help, but I am afraid that post did not help for my case.
I know the field LIKP-ZUKRL can help in splitting a delivery. But this will lead to a "whole" delivery split. i.e. 2 delivery note is required.
For my case, what I need is:
In the Sales Order Line item, it did not specify the storage location. When I create a Delivery, it should automatically fill up the storage location, and delivery quantity base on the stock level, if the material exist in multiple storage location and stock in one location is not enough to fullfill the required qty, then it should propose multiple dn line item with different storage location filled.
All should be in the SAME delivery. It is just a matter that the delivery items are different.
Anymore advise? Thanks a lot
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.