on 12-03-2008 10:12 AM
Dear friends,
in sap R3 i have lot of material which needs to be transferred to PPDS. every material has split valuation. there are 9 valuation types for every material. how can this be mapped in ppds as there is no accounting view for a product.
pls get back with ur suggestions.
thanks
vinay
Hi Sanjeev,
PPDS is not concerned very much with costs, it is only a planning tool. The optimization mostly optimizes resource consumption, and does not seek to minimize cost. Standard Costs are generally irrelevant. Therefore, these data items are not normally sent to APO.
Regards,
DB49