Former Member
0 Kudos

Hi SAP Guru's,

I have to prepare POC for one of our client and i am not aware about what to cover and in which sequence....please guide me how i can prepare myself for the POC.

Any input will be of great help.

please provide ur input.

Thanks,

Kamal Rana

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Here I take POC as Proof of concept and not Percentage of completion.

For demostrating POC (Proof of concept) to the client the following points need to be kept in mind:

- Type of Industry/ client operations

- Requirements of the client

- what is the process flow you want to demostrate

- whether the process is a unique requirment or a general process flow in a project

- Since PS integrates with a lot of modules in SAP like FI/CO, MM, SD, HR, PP etc it is essential to know which part of the process you would like to demostrate so that the necessary config can be taken care of.

- once the above have been identified, it is to be mapped how PS can take care of the requirements and have a process flow finalized to have a clear input/ output data.

- Finally realize the process flow on the system with necessary configurations.

Hope this helps

Venu

Former Member
0 Kudos

Hi ,

Can you describe the POC requirement in a little more detail ?

POC means Percentage of Completion !! but what kind of Percentage of Completion is ur client looking for ?

is it related to POC w.r t Activity or POC w.r.t WBS elem

and there are lot of other methods of doing POC which are each applicable in different scenarios!!

Regards,

M.Amarendra

Former Member
0 Kudos

Hi Kamal,

Please check link as mentioned below

http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSPRG/PSPRG.pdf

Regards

Tushar

Former Member
0 Kudos

Hi Rana,

This thread may help you.

Regards

Chandra