on 11-28-2008 1:44 PM
Even after creating material master for the main item am getting an error msg during the transaction CS01 as "material does'nt exist or is not activated"...HELP ME OUT
Hi,
Have you given Item Category Group as "ERLA/LUMF" in your MMR? If not then put it there and go to CS01.
Hrishi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
First of all check your material in TABLE MARA whether material exit or not.
Sales BOM Implementation
A bill of material (BOM) describes the different components that together create a product. A BOM for a bicycle, for example, consists of all the parts that make up the bicycle: the frame, the saddle, wheels, and so on.
Process Flow
When you enter the material number of a bill of materials that is relevant for sales order processing, the system displays the material that describes the whole bill of materials as a main item. The individual components are displayed as lower-level items.
There are two ways to process a bill of materials in Sales. Once you have entered a bill of material in a sales order, the system runs pricing, inventory control, and delivery processing at:
Main item level if the material is assembled, or
Component level if the material is not assembled
The type of processing used by the system is determined by the item category group that you enter in the material master record for relevant materials.
Processing at Main Item Level
If you want the system to carry out pricing, inventory control, and delivery processing at main item level, enter ERLA in the Item category group field of the Sales: sales org. 2 screen in the material master record of the finished product. This means that the components only function as text items and are not relevant for delivery. The following graphic shows how a bill of material is processed at main item level.
Processing at Component Level
If you want the system to carry out pricing, inventory control, and delivery processing at the component level, enter LUMF in the Item category group field of the Sales: sales org. 2 screen in the material master record of the finished product. In this case, only the components are relevant for delivery. During processing the system automatically creates a delivery group. The latest delivery date among all the components becomes the delivery date for the entire delivery group
Rgds
San
Edited by: SAN_SD on Nov 28, 2008 3:11 PM
Dear Saravanakkumar
No problem; once you maintain the required view in OMS2, go to MM01, input the existing code and click on "Select views", so that now you can see the view what you wanted. Select the same and execute so that system will show a message "Material already created and will be extended".
thanks
G. Lakshmipathi
Ensure that all the sales views are extended in the material master.
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
check all the BOM header and child materials existing in the plants. Try to check the material existance in plant and storage through MM02/MM03.
Prase
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.