cancel
Showing results for 
Search instead for 
Did you mean: 

Sap R/3 and XI -- Commit fault ModuleException. Please help

Former Member
0 Kudos

Hi All,

I have a RFC interface between Sap R/3 and XI.

I am getting error in SM58 in R/3 :

Commit fault com.sap.aii.af.mp.module.ModuleException: call to messaging.

If I do test connection on in SM59 on TCP connection it's ok.

For the above error I also receive for some time the below SLD error message in RWB of XI

"Error during communication with System Landscape Directory: HTTP response code: 503 (Not Ready)"

Please advice as it is production problem.

Regards

Accepted Solutions (0)

Answers (4)

Answers (4)

SudhirT
Active Contributor
0 Kudos

Hi Rick,

Sometimes this error comes when there are huge amount of transactions taking place simultaneously. To resolve this ask your Basis guy/DBA to increase the screen numbers in database.

Thanks!

former_member190389
Active Contributor
0 Kudos

Hi,

Please let me know how did you resolve the issue.

dharamveer_gaur2
Active Contributor
0 Kudos

Hi

For Commit Fault look SAP note may help you- 775765,730870

dharamveer_gaur2
Active Contributor
0 Kudos

Hi

Check note 803145 for 503 error.

Former Member
0 Kudos

Hi,

And please let me know for ModuleException RFC error that I am getting in

sm58 tx in R/3.

Regards

prateek
Active Contributor
0 Kudos

Perform SLDCHECK first and refer to SAP Note 764176.

Regards,

Prateek