cancel
Showing results for 
Search instead for 
Did you mean: 

copy of an ECC system(PRD) to an other system(QAS) by restore of database a

Former Member
0 Kudos

I wander how to make a copy of an ECC system(PRD) to an other system(QAS). The standard homogeneous system copy takes too much time.

I know it is possible by restore of database and changing ID of database. How to deal then with SAP part?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Jan,

A database restore method is possible for an ABAP only system. If you have a Dual Stack system then you may do a data base restore method in combination with an export of your java stack using sapinst. This is fully documented in the homogeneous system copy guide whihc is available at

https://websmp209.sap-ag.de/systemcopy

Regards,

David

Answers (2)

Answers (2)

former_member204746
Active Contributor
0 Kudos
former_member227600
Contributor
0 Kudos

Hi,

If you have only ABAP stack than you can perform system copy using database restore method ,if you are running ABAP+java stack than follow the standard method export/import using sapinst tools to perform system copy. Database restore method is not supported in ABAP + Java stack enviornment.

karan.