We are in Final preparation phase of an implementation and we seek your help to fix the following issue.We have a problem with QM Master Inspection characteristic and Class characteristicwhile using them for variant configuration.
Following are the steps in sequence We followed to simulate this scenario.
1. Created 10 class characteristics for the class type 300.
2. Activated the inspection type 03 and 04 and also selected the option Inspect by configuration in the material master
3. Created 10 MICs with reference to respective class characteristic(Note: only one class characteristic is assigned to one MIC)
4. Assigned only one MIC in the routing(using for inspection type 03) and in the inspection plan(using for the inspection type 04)
5. Released the production order and inspection lot has been generated.
6. During results recording we could see 10 MICs in the lot, we suppose to get only one MIC in the lot.
7. We have same problem with the lot of inspection type 04.
Kindly provide us the possible reasons for this issue.
Thanks and Regards,
Sharat
Hi Sharat,
Why you have ticked the indicator "nspect by configuration". Keep the indicator "insp. with task list", hence you are going with the inspection plan.
Do the same, test with new data and revert.
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.