on 11-19-2008 5:54 AM
Hai gurus,
i had created a sampling procedure using T.C QDV1 and while creating inspection plan
using T.C QPO1 ( For raw material incoming inspection) the sampling procedure which i
had created using the T.C QDVI is not displayed for selection.
How to link sampling procedure .
regards,
sekar chand
Hi Sekar, If the specification set for the Sampling procedure doesn't match with the type/Control indicators for the MIC, then this discrepancy can happen.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi shekar,
1. Go to QS61 give ur material, click on charectristics u will arrive at material specification screen. here for the MIC click on detail icon and assign the sampling procedure. try and get back. i think this will help u
sree
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Kindly check your sampling procedure, there are four options to create the same.
Inspection points
Without inspection points
Plant maintenance
sample management
Free inspection points,
Kindly mention which one you have selected from the above
Regards,
Sri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
set the Sampling Procedure is Required in the MIC control indicator in Plan, then system will ask yuo to enter the sampling procedure.
If you set this indicator, a sampling procedure must be assigned to the characteristic in the task list.
-ashok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hai Mr Ashok,
1)set the Sampling Procedure is Required in the MIC control indicator in Plan, then system will ask yuo to enter the sampling procedure.
I had activated the sampling procedure is required under sampling( under quantitative selection)
2)If you set this indicator, a sampling procedure must be assigned to the characteristic in the task list.
But the system is not asking for the sampling procedure, but i had assigned the inspection method.
waiting for your reply
with regards,
sekar chand
Edited by: sekar chand on Nov 19, 2008 10:08 AM
Dear Sekar,
Check whether you have set the indicator 'No use in inspection plan' in your sampling procedure. Else see if you are trying to assign this sampling procedure(Not defined for SPC) for any SPC characteristic.
Regards,
Ravi Kumar C.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.