on 11-18-2008 10:19 AM
hi,
when i am creating the sales order with reff to quotation the schedule lines arre generated.,
But when i am directly creating thesales order for the same material no schedule line are generated for the same doc type also.
Can some body guide me why its happening and how automaically schedule line can be generated in this case.
hi,
Actually my previous solution doesnt help u out, anyways u try in copy control from quotation to sales order , item data ,copy schedule lines, u just check the box and try .
regards,
ram.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Please check follwing settings:
1. T. Code: VOV7 - check with your Item-Category, whether Box: Schedule Line Allowed is marked and ticked?
2. T. Code: VOV4 - Item Category Assignment to Sales Doc type
3. T. Code: VOV5, please check the determination i.e
item category+MRP type= schedule line cat
3. T. Code: VOV6 - Select your Schedule lIne Category and check whether Boxes: Req./Assembly & Availability under Tab: Transaction Flow are marked as ticked?
Best Regards,
Amit.
Note: Apart from this, Please refer:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
plz check the scheduline category determination( vov5),
item category + mrp type( material master)
so, plz check the mrp type in the material master.
regards,
ram.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
am sure the item category is getting changed in both the scenarios. If yes, check in VOV7 for schedule line allowed option.
cheers,
anil.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check the item category of your sales order material in VOV7 and check in Business Data Tab whether "Schedule Line Allowed" indicator is checked or not if not then set it.
Regards
Subhasish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi subhasish,
Its already checked in the business data .. the problem is that when i am creating a sales order with reff to quotation system automatically generates the schedule line , but when iam creating sales order directly without any reff schedule lines are not getting generated.. kindly help in this regard
Hi,
Check the schedule line assignment by going on this step
IMG u2013 sales and distribution u2013 sales u2013 sales document u2013 schedule lines u2013 assign schedule line categories
Check whether any schedule line is assigned to you item category and mrp type.
If not then please do it that
If still the problem exist then post it over here
Regards
Raj.
HI,
Please check your Schedulne category in VOV6 whether Avl check and Req/Assembly should be Tick.......
Check it and Update ............
Regards
Raj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.