plant should be coming automatically-

Former Member
0 Kudos

Dear Experts

through CMIR(VD51) plant is determined and will come to sales order automatically.

I know plant shoud be determined 1- in Customer master data 2- in M aterial master data and 3- CMIR (VD51)- apart from that what is the proceure for which plant will be coming in sales order automatically along with Storage location

Idont want enter plant and storage location manually so tell me how both plant and storage location automatically when you enter material in line item.

thanks

sunil

Accepted Solutions (1)

Accepted Solutions (1)

former_member550050
Active Contributor
0 Kudos

Hi

In sales order plant need not have to be entered manually

It will get determined in the seq CMIR-CMR-MMR not in the sequence mentioned by you

First the system will look for CMIR then -CMR-then- MMR

Storage location wont get determined in sales order in standard

It will get get determined in delivery document according rule MALA or RETA or MARE mentioned in delivery type

If you mention storage location manually in sales order then it gets copied to delivery

If you want to get storage location determined automatically in sales order then you have use userexit MV45AFZZ

Plant also if you can change manually in sales order which was proposed by the system

Then the manual changed plant will take the control for the entire process

Regards

Raja

Answers (2)

Answers (2)

Former Member
0 Kudos

thanks

for your sugestion

thanks

sunil

reazuddin_md
Active Contributor
0 Kudos

As per std sap,

storage location will not copy in sales order automatically.

Until unless you write logic in userexit.

coming to plant,

plant will be copied from CMIR - CMR -MMR in sequence.

or else USEREXIT as per the logic in prog