cancel
Showing results for 
Search instead for 
Did you mean: 

Combine putaway for goods reciept in WM

Former Member
0 Kudos

For material A, the LE palletization QTY is 300 in material material data/WM2 view,for material B,the LE palletization QTY is 200 in material material data/WM2 view.

There are one delivery No. like below

delivery No. delivery item material QTY

101 1 A 100

101 2 A 200

101 3 A 100

101 4 B 100

101 5 B 100

101 6 B 100

we need below three kind of solution

solution 1

The TR is generated when we post GR based on the delivery automatically

The TR doc is like below format, the TR QTY is consilidated

TR No. TR Item No. Material QTY

1 1 A 400(100200100)

1 2 B 300(100100100)

So when the TO is generated automatically based on the TR 1 in system, the TO QTY in every TO item are filled by the "LE Palletization QTY" in material master, the left QTY will occupy one TO item.

TO No. TO Item No. Material Source bin QTY destination bin QTY destination bin

1 1 A 300 300 01-01

1 2 A 100 100 01-02

1 3 B 200 200 01-03

1 4 B 100 100 01-04

So we can save two bin comparing we put one bin for one delivery item in this solution(there are 6 delivery item and only there are 4 TO item ).

Solution 2

The TR is generated when we post GR based on the delivery

the TR doc like is below format, the TR QTY is not consilidated

TR No. TR Item No. Material QTY

1 1 A 100

1 2 A 200

1 3 A 100

1 4 B 100

1 5 B 100

1 6 B 100

But when the TO is generated automatically based on the TR 1 in system, the TO QTY in every TO item are filled by the "LE Palletization QTY" in material master, the left QTY will occupy one TO item.

TO No. TO Item No. Material Source bin QTY destination bin QTY destination bin

1 1 A 300 300 01-01

1 2 A 100 100 01-02

1 3 B 200 200 01-03

1 4 B 100 100 01-04

So we can save two bin comparing we put one bin for one TR item in this solution(there are 6 delivery/TR item and only there are 4 TO item ).

Solution 3

The TR is generated when we post GR based on the delivery

The TR doc is like below format, the TR QTY is not consilidated

TR No. TR Item No. Material QTY

1 1 A 100

1 2 A 200

1 3 A 100

1 4 B 100

1 5 B 100

1 6 B 100

But when the TO is generated automatically based on the TR 1 in system, the TO QTY in every TO item are kept same as TR QTY. but the destination bin can be filled based on the "LE Palletization QTY" in material master by the TO QTY from different TO item,

TO No. TO Item No. Material Source bin QTY destination bin QTY destination bin

1 1 A 100 100 01-01

1 2 A 200 200 01-01

1 3 A 100 100 01-02

1 4 B 100 100 01-03

1 5 B 100 100 01-03

1 6 B 100 100 01-04

So we can save two bin comparing we put one bin for one TR item in this solution(there are 6 delivery/TR item and only there are 4 TO distination bin). solution 3 maybe can be achieved by set add-on stock in storage type setting, but it need testing.

Altogether, We prefer the solution 1 and 2 because solution 1 and 2 are more consistent to actual business(user do consolidation to one pallet in GR area and not in "putaway bin" area). Could you help find the achievement method in SAP system for solution 1/2/3?

Tks very much

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member536836
Active Contributor
0 Kudos

Hi,

To achieve this please do the following.

1.Maintain storage type indicator in Material master in WM view1.

2.Maintain palletization data in WM view2

3.Define your storage type search strategy with storage type indicator.

4.Create bins for storage type.

Please refer WM config guide to setup warehouse set up.

By doing all the above activities you can able to achieve the solution mentioned in question.

Hope I have answered your question.Please let me know if any details required.

Regards,

Prashant