cancel
Showing results for 
Search instead for 
Did you mean: 

Reservation of Quantity in Batch

Former Member
0 Kudos

Dear all,

Please consider the following scenario.

There are 2 batches of material M1 with following quantity

B1 40 Ton

B2 40 Ton

There are two sales order S1 and S2 of 30 quantity of M1 each

From sales order S1 I have created a delivery D1 and selected batch B1 for these 30 tons. The PGI will be done later.

Now when I create delivery D2 from S2, and if I assign B1 again for 30 ton, the system is allowing it. I want to stop this and only allow the remaining 10 tons to this second delivery.

Is this possible in standard SAP?

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member204513
Active Contributor
0 Kudos

Dear Sulab,

Even if you assign more quantity than available quantity system will throw error message while doing PGI system will not allow you to do the PGI with that excess quatity.

I hope this will help you,

Regards,

Murali.

Former Member
0 Kudos

Dear Murali..,

Thats what I mentioned.. There is no PGI.. I want the blocking/ reservation to happen as soon as the delivery order is created.. before PGI is done..