Hi QM Masters

I am working in the multiple specification.I have activated the mulitple specification in the client level and activated the multiple specification indicator in the material master level.But i am not able to make the indicator active in the inspection plan header level.It is in the display mode.I am able to maintai the objects and object types in the material assignment

What settings i miss?

Regards

Mohan

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Mohan,

Amol is 100% correct. After setting the Multiple specification indicator in Config., Material Master,,,, you need to set the same in the Inspection plan also and it can't be done via QP01/QP02. You can set it through the Engineering Workbench CWBQM

CWBQM->Header (Details screen)-> Additional Data.

[Refer the attached link|http://help.sap.com/erp2005_ehp_03/helpdata/EN/96/390c4222545f24e10000000a1550b0/frameset.htm]

Regards,

Shyamal

Former Member
0 Kudos

Hi Mohan,

Multiple specification indicator for inspection plan can only be set through engineering workbench T code - CWBQM.

Amol