on 11-03-2008 2:59 AM
Hi All,
i have requirement for quality check for dormant material i.e. if a material is not procured (no GR ) for the last 6 months but at the time of last GR date, 6 month back, this material was at skip stage(as per Dynamic modification rule).
and after 6 month also the stage will be same.but i want if material is coming after 6 month the inspection stage should switch to 1st stage(initial stage).
Hope I am clear. Can anyone help me in this issue.
Thanks!!
Vinay Upadhyay
Hi Vinay,
If you put the max inspection duration the system then make the current inspection lot is due for inspection as a result of the maximum skip duration, although the quality level contains a skip as the next inspection stage this is i think limitation of SAP.
Regards,
Tushar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
In your DMR,skip stage - enter maximum period as 6 months
this will create inspection lot( if the GR period expired 6months)
thanks
sami
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sami,
if i give max. skip duration, it will be applicable only for skip stage. and my requirement is, if for last 6 months no GR and No inspection lot creation, happend then automatically inspection stage should switch to initial irrespective of current stage( may be skip or normal or any stage).
Hope i am clear this time.
Thanks!!
HI
Your correct, u have to assign next stage as initial or as u wish whichever stage you can assign
then system will reset after 6months to next stage
if you have doubt better to test this function, you give the maximum skip duration as 1 day or 2 and test it.
i hope your clear now
thanks
sami
Edited by: sami sami on Nov 3, 2008 3:41 PM
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.