HI,

In pricing procedure for

vprs & ek02 we need to give subtotal B & requirement 4 what is the reason for this

pl suggest

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hello,

For EK02 and VPRS, the sub total is B, Carryover the value to the structure KOMP filed WAVWR (Cost). Both of them are statistical condition types.

VPRS conditiontype has a requirement 4 assigned to it. This requirement is met if the sales document item category has been configured to determine costs.It also verifies that the plant is set, the valuation area company code and the sales organization's company code are identical, and that the item is not a down payment item. This requirement can be assigned to the cost condition type in the pricing procedure (standard delivered condition type VPRS) so that the cost price is only determined for relevant item categories. This requirement is only available for sales pricing.

Example:

An order is placed that contains both stockable and non-stock items. Non-stock items are represented in the sales order with the item category TAX. TAX has been configured so that the cost is not determined during pricing of that item in the sales order. Stockable items have been configured to determine costs so that the net sales price can be compared against the cost price. Requirement '4' is assigned to the cost condition type in the pricing procedure so that the cost price is only accessed if the item category is relevant for cost determination.

Prase

Former Member
0 Kudos

Requirement '4' is assigned to the cost condition type in the pricing procedure so that the cost price is only accessed if the item category is relevant for cost determination.

Sub totals:These condition amounts or subtotals are used as a starting point for further calculations.

Sam

Former Member
0 Kudos

Hi,

Requirement routine 4 logic for VPRS is as below,

Company code should exist in the sales order..

Plant should be entered in the line item level..

There should not be any billing plans..

If above criteria fulfill then only VPRS will triggered other wise it will not...

Let me now if you need any clarity related to above explanation...

Regards,

Chandra

Former Member
0 Kudos

reqt 4 is for that even if vprs/ek02 r cost condition type , cost wont get calculated if yr item category is not relevant to costing.Subtotal B is store the cost value once calculated for further use.Hope this answers yr question.

Rgds