on 10-29-2008 5:23 AM
Dear Friends,
Using T.code CJ48, I entered period,F.Year,WBS Elements,Commitment item & selected periodscreen.
I am getting the error 'No wbs elements match the selection crtieria.
How to reslove the error?Please advise.
Regards
Sridhar M
thanks for the answers
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Friends,
Thanks for all the answers.
while using T.code CJ48, The system displays planning layout,I want to change the planning layout.Please let me know the T.code how to cahnge the planning layout.
Regards
Sridhar M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I have used T.code OKKS - set controlling area.I have tried to set up the planning and it has not resloved the problem.
Can you please explain with T.codes how to reslove the problem.
Thanks & Regards
Sridhar M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sridhar,
May be you are entering WBS Element in wrong way, Please take care of following when you are performing this transaction:
1. Check if you are entering the Lower level WBS element or not.
2. Project should not be logged on in different Screen.
3. CJ48 Transaction depends on planning layout try to check withh T-Code OPo3 for planning layout and KP34 for planner profile.
4. Also try to check with Transaction OPTT for account assignment categories for Orders.
5. Check in reports also for respective WBS element for commitments.
6. Drill down to the lower level WBS Elements and check.
I hope these information may be helpful for you.
Regards,
Krishna Singh
Dear Friends,
WBS element 3-4400/33 is software. commitment item is 1217 is computer software, which i inputed in T.code CJ48. I am still getting the following error as mentioned below.
WBS element 3-4400/33 not valid
Message no. PSZ1005
Diagnosis
WBS element 3-4400/33 does not exist or is not assigned to controlling area 1500.
System Response
Processing stopped.
Procedure
Check your entries.
If necessary, change the controlling area by choosing Extras -> Set controlling area.
How to reslove the issue?Please advise.
Regards
Sridhar M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sridhar,
This is not a technical error, please check for the commitment if it really exist and is your WBS element is space and case sensitive, this error may occur due to that also. Try to enter WBS element by clicking on to the radio button or by the F4 function.
Basically you need to check the data which u r using to carry out the transaction.for example if the WBS element is released or not , or if it has been marked as planning or account assignment element.
Thanks,
Dhruv Kumar Malhotra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Pl see if the WBS is Planning element/Accounting element?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.