Hi Friends,
I have created Std. WBS and Std. network and one material .Now i assigned this material to WBS and network in CN08.
Now I created a sales order for above material.Afetr saving the sales order I am getting the no as 11456.
Now I am opening the project in cj20n with (E-1456) using last 4 digits of sales order.
But getting the message that project E-1456 does not exist. I think procedure is correct but still getting error.
I m using IDES.
Anu suggestions where I am wrong ?
Help will be rewarded.
Regards
Hi
Refer Similar thread
And the document-
http://help.sap.com/saphelp_46c/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pl make sure the following settings
In OVZG checck the req class 212 shuld hv n/w type as PS04
In OVZH the the req type KMPN shiuld be with req class 212
SPRO-Project system-Material-Control of Sales order related production-Selection req. thru MRP- Check Planning strategy--
strateg 85 shuld be with KMPN
Rgds
In OVZG doble click on 212 req class : Confirm following
Reqmts class 212 Netplan/proj.settlmt
Availabilty Tick
Req transfer Tick
Assembly type 2
Special Stock E
Order Type PS04
Acct Assgt Cat. D
In OVZH
KMPN shuld attached to 212
In Strategy grp doublclick on strategy 85
to 85 planning strategy KMPN shuld be there.
In checking rule for that material put all no checks
Rgds
st
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ONE more thing, u will get the RESULT in CNS41.
u will find Project from sales order like CNS41, DB profile- tick selection criteria as sales doc.
value from sales doc will be planned revenue for corresponding WBS.
REGARDS,
ANSAR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
A Project is automatically generated from a sales order, when material in line item have been allocated in CN08, This determines which WBS structure is to be used as the basis for project creation, which has also been linked to a STD network, Bcoz SD/PS assign is ON i the STD PRJECT DEFINATION control data.
ON - A WBS leg is created for each sales order line item including similar Network.
In OPSA only one root must not be ticked.
Setting in Material Master.
Delivery Plant in SALES ORG VIEW 1
Item Category Group SALES ORG VIEW 2
MRP type: NO MRP indicator ND
Strategy group: 85
Individual /coll reqmt: left blank /1 individual reqmt.
MAETRIAL must be configurable.
let me know if u need more help
CHECK all this seeting in your reqmt.
Hope this will slove ur problem.
REGARDS<
Ansar.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
open ur sales order and check wheather ur wbs is coming.(wbs will be in same row of material)
if wbs is coming then try to open project by this wbs.
regards,
Vivek Tripathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please check your SD Configuration for
Document Type.
Item Categories.
Requirement Classes .212 check whether it is PP04
Rquirement Types.KMPN
In config for schedule line Categories, select Req/Assembly option.
Regards,
Nitin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.