Dear all.
I create a sales order in tcode va01 and input a wbs element E-000009.1 in the field of WBS Element at Account assignment tab of one item detail.When save the sales order,sap pop up a message box with text "Sales order has no CO object".The detail message content was pasted at bottom.When confirm the first message box,sap pop up the second message box with text "Error when processing Network".The detail message content was pasted at bottom.
So I need the experts give me some useful advice and reference to resolve the problem.
Thank you.
Regards
Yoda
-
Sales order has no CO object
Message no. CO323
Diagnosis
The production order should be settled on the sales order.
The requirements type of the sales order, however, refers to an account assignment category that does not allow settlement using the sales order (key consumption posting).
Procedure
1. Check which requirements type in entered in the relevant sales order item
Display sales order
2. Check the settings for this requirements type in Customizing
(See Control sales order-related production).
-
Error when processing Network
Message no. V1380
Diagnosis
A technical error has occurred. On calling up the assembly interface, exception 2 was triggered. The exceptions have the following meanings:
1 = External block
2 = General error
3 = Insufficient data for the interface
4 = Order was not found
5 = Update has been rejected
6 = Final document number for Network is not issued
Procedure
Inform your system administrator.
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
the possible reasons can be
1. in sales order procurment tab page check requ. type and in tran OVZG check details.in this details consumption indicator should P , account assignment Q
2. You may not have marked operative indicator as billing elements.
3. u R using wrong req type / strategy in material master.
regards
shashank
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear shashank.
Thanks for you reply.
1.I have checked the sales order and the requ. type was KMNP.In tran OVZH the requ. type KMNP use the ReqCl 202.In tran OVZG I checked the ReqCl 202 and the "Acct.assig.cat." was Q and the Consumption was P.
2.In tran cj20n I checked the wbs element.Its operative indicator was billing elements.
3.In tran mm03 I try to found the field of "req type / strategy".But I could not this field.Could you tell me the "req type / strategy" field was in which view?
Thank you so much.
Regards
Yoda
U would setup Stratergy group in Material Master MRP3 view.
In the standard system there are two strategy groups for assembly processing with the Project System:
Assembly processing, network without project (083)
Assembly processing, network with project (085)
Refer below link...
http://help.sap.com/saphelp_47x200/helpdata/en/d7/b8853488601e33e10000009b38f83b/frameset.htm
Venkat
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.