cancel
Showing results for 
Search instead for 
Did you mean: 

Regarding Pipeline

Former Member
0 Kudos

Hi,

where we can see the Pipeline steps

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

YOu can see the Pipeline from transaction SXMB_ADM, one of the options is Pipeline.

But it just gives the details of the pipeline and not the step.

Ihe steps can be seen in the SXMB_MONI, if you go to any message and then go to trace inside, it gives the details of the steps the message has gone through.

Regards

Siddhesh

Edited by: Siddhesh Naik on Oct 21, 2008 1:59 PM

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi,

You can the steps in SXMB_MONI

The pipeline steps are as follows:

a) Receiver Determination:

This step determines the system that participates in the exchange of the message.

b) Interface Determination:

For each receiver determine which interface will should receive the message.

c) Message Split:

If more than one receiver are found, XI will instantiate new message for each receiver.

d) Message Mapping:

Mapping to transform the source message to destination message format.

e) Technical Routing:

Bind a specific destination and protocol to the message.

f) Call outbound Adapter:

Send the transformed message to the adapter or a proxy.

Refer this link for more details:

https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9928db90-0201-0010-6894-ffa...

Regards,

Nithiyanandam

Edited by: Nithiyanandam A.U. on Oct 21, 2008 11:15 AM

Former Member
0 Kudos

Hi,

To view Pipe line execution steps(You should have access to SXMB_ADM:)

1.Go to SXMB_ADM.

2.select Display Pipeline defination option.

3.Select PipeLine Id as (SAP_CENTRAL).

4.Click on Pipelineelement tab.

Then u can see the pipe line steps exactly.

Regards

Sridhar Goli

former_member192295
Active Contributor
0 Kudos

Hi,

We can see pipeline steps in SXMB_MONI window. In this window message log contain pipeline all steps messages.

Former Member
0 Kudos

Hi kushee,

the pipeline steps are mainly checked by the BASIS people there should be authorizaton for SXMB_ADM

do chk this link

http://help.sap.com/saphelp_nw04/helpdata/en/c4/9a5c3bab977239e10000000a114084/frameset.htm