Hi,
Can someone help explain safety stock/min safety? Is this the same as a min/max or rop/roq?
Thanks,
Rob
hi,
Safety stock
Specifies the quantity whose purpose is to satisfy unexpectedly high demand in the coverage period.
The risk of shortfalls is reduced by having a safety stock.
Minimum Safety Stock
The quantity that defines the lower limit for safety stock. This value cannot be exceeded.
You can specify a minimum safety stock. If the result of the safety stock calculation is lower than this limit, the safety stock is then automatically set to this minimum value. You enter the minimum safety stock in the material master record (the MRP 2 screen).
Hope it clears your idea....
Regards
Priyanka.P
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The purpose of the safety stock is to prevent a material shortage from occurring. In order to determine the safety stock level, you must first specify the risk of a material shortage and also the desired service level.
http://www.sap-basis-abap.com/mm/what-is-safety-stock.htm
Use the Search.......
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.