Hi All,

Iam Basis consultant, We are going to implement the HCM.Our backend system is ECC 6.0 and HR patch level is 3,basis patch is 7 and portal patch is 9,So do I need to install seperate HCM system or only required SP's to be deployed.Wherecan I find implementation doc. which are basis responsibilities.please suggest me

regards

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos
Former Member
0 Kudos

Hi All,

Any of you please tell me required SP's to be downloaded and also implemetation doc for implementing HCMESSMSS backend system ECC 6.0. What configuration & installation is required to be effective. As per basis consultant, .