Dear Sap Gurus
I m unable to capture overhead cost like salary , wages etc..
in my cost run.
When I do ck11n my material cost and Activity cost is coming.
What configuration to do ?
Also from user end what all activity has to be done to get the overhead cost.
Plz help as i m stuck in my project.
Regards
Raj
Hi Tushar,
For calculating Overhead cost you need to do following things:
You have to maintain overhead percentage ( for both plan and actual) in Cost sheet using tcode KZS2
You should create overhead key using tcode OKOG and Overhead Group using Tcode OKZ2 and assign to each other with valuation area
Assign Overhead Group in Material Master MM02 in Costing 1 Tab
After doing confirmation of production or process order you have to run overhead calculation using tcode KGI2, so you can analyze plan and actual overhead cost.
I think this must solve your problem.
Cheers,
Nilesh Joshi.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.