Actvity Price Calculation

Former Member
0 Kudos

Hi

Is it possible to calculate the per unit activity price from the actual posting figures and that should be available in KP26 planning for the next month?

Regards

Kamlesh

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Done

Former Member
0 Kudos

Hi,

You can calculate the actual activity unit prices. For this u need to have seperate configuration setting like:

- Setting up Splitting Structure

- defining splitting rules

- assigning the splitting structure to cost centers

Etc

After that u need to do Cost Splitting (using KSS2) and Actual Price Calculation (using KSII)

This actual price can be carried forward as planning price that can be viewed in KP26 by transferring/copying the data from this actual prices to next month planned prices using KP98 Transaction Code

Best Regards

Surya

Former Member
0 Kudos

Thanks.

Can u give any good document for the related configuration and steps. It will be of good help.

Kamlesh

Former Member
0 Kudos

Hi, Yes. It is possible for the system to calculate the actual activity price by splitting if there are more than one activity are assigned to the cost center and actual price calculation during month end activities of the previous period. This calculated actual price for the previous period can be copied to the current period. It is not at all logical the system will calculate the actual activity price and post it as planned price KP26. It is futurestic. Trust this helps much! Cheers!

Former Member
0 Kudos

Have you tried copying current month Actuals to next month Plan using the T-Code KP98?