New scenerio

Hello everybody

IF you have time kindly check this scenerio and Help me.

1) Change OPK4 settings to Error message when overdelievery exeeds.

2) In material master(WS View) of header item make tolerace 0 an 0% and let unlimited delievery box unchecked

3) Make a BOM.

4) Make a routing with 4 operation 1st operation with control key PP01 and 2nd operation with control key PP01and third operation with PP07 (Rework) and Last operation with control key PP01.

5) Make a production order(10 Pc) of header item and release it.

6) Confirm first operation with yeild as 1 only

7) Confirm second operation with yeild 2 system will show only Error message message, then confirm with only 1 quantity

8) Confirm 3 operation(with Rework control Key) with yield 100 Pc system will not give error message but only give Warning Message. Why?????? ( if you Change control key of third operation to PP01 it will give error message while overdelievery.

Kindly give solution that that for Rework control key also How sytem should give Error message while overdelievery.

Thanks and Regards,

Former Member
Former Member replied

Hello Chandru,

Please Refer Note 844617 for that.