MRP RUN.

Former Member
0 Kudos

How to run MRP for multiple line item(material) in a single PR.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi,

generate planned order instead of pr by md03 and then convert it into pr by md14

regards

points if helpful/solved

former_member581212
Active Contributor
0 Kudos

hi,

I have never came across such a situation...i think it possible for single item and single level, single item and mulitple level...

Pls check...

Regards

Priyanka.P