Error during calculation of work in process (WIP)

Hi all,

I have a problem during calculation of WIP. After entering all data, system reports me that WIP calculation could not be done because of following error:

Create a cost element for the usage of inventory (line ID COP)

Message no. KJ307

Diagnosis

In results analysis, capitalized costs are created and apportioned to the line IDs. If the Split creation/usage indicator is set in the extended control of the results analysis version, then the usage of the capitalized costs is written under a separate results analysis cost element for each line ID.

Procedure

Go into Customizing for Product Cost Controlling and carry out the following steps:

1. Create a cost element for the capitalized costs used for line ID COP.

2. Enter this cost element under Define Update for Results Analysis.

I can't find transaction or path for solution from the procedure. Pls help.

Thank you all.