Valuation for the Finished Good

I have finished good material with Price Control u201CSu201D with a price of Rs 100.

To make this finished good I need 5 raw materials and all the 5 material masters are having the price control u201CVu201D.

Price of these 5 raw materials is fluctuating and the total cost of the finished good varies accordingly.

Now If I valuate this finished good then the system is valuating this on the price which I have maintained in the FG master (under price control-S i.e Rs 100). But due to the fluctuation of the raw material price, now the FG price is Rs 120 (after adding all the Production charges etc)

I want to valuate the FG stock at Rs 120 not at the Rs 100.Valuation level is maintained at Plant level.

Because of this, huge difference is coming into the stock valuation.