Copying a Project in SOLAR_PROJECT_ADMIN

I was trying to copy an existing project using the "Copy Project" option in SOLAR_PROJECT_ADMIN. When I did that, the documents on the "Project Documentation" tab were copied (as desired) but those document attributes (i.e. the "Person Responsible", "Document Status") all changed. These fields did not match what was in the originial project.

Is this a configuration setting that needs to be changed or is this a setting in "Copy Project" that I missed?