Message no. 175 when doing REM backflush MFBF.

Hi PP Gurus,

I'm facing error while doing MFBF for FG. Message no is RM175 and the detailed description for this message is

Diagnosis

This error appears under the following circumstances:

The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.

The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.

Procedure

The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.

Use product costing to create the standard cost estimate.

Before taking standard cost estimate all the settings are maintained properly. The subjected material is handled through Split valuation and before doing standard cost estimate some SD transaction have been already done on the same material.

If anybody faced the same problem, please help me out to get out of it.

Thanks & Regards,

Abu Arbab

replied

Dear,

I'm not sure Please check the note 552486 that contains information.

Please refer to NOTE 552486 (FAQ)

In the case of split valuation only header and not the valuation

type is costed. If one material has split valuation, standard price will be released.

Did you the standard cost estimate?

Please check this errror?

Before taking standard cost estimate all the settings are maintained properly. The subjected material is handled through Split valuation and before doing standard cost estimate some SD transaction have been already done on the same material. please check all these?

Regards,

R.Brahmankar

0 View this answer in context